Knauf Uniflott 5kg Spackle for Drywall Joints

<p>Highest quality gypsum spackle modified with polymer additives, designed for manual application. Uniflott joint compound is suitable for any gypsum boards with different edge types (HRAK, HRK, SFK, AK). For sealing joints of acoustic panels (Cleaneo, SK, UFF), floor panels (Knauf Brio, Knauf Brown, Knauf Vidifloor), gypsum fibre boards (Knauf VidiWall). For walls and ceilings in interior work.</p><u>Technical Data:</u><ul><li>Complies with standard LVS EN 13963</li><li>Fire reaction class A1, non-combustible</li><li>Type 4B fine joint compound</li><li>Air, substrate and material temperature during application and drying must be above +10 °C</li><li>Consumption approx. 250 g/m of joint (depending on the thickness/type of gypsum board)</li><li>Time to start of setting 40 min., complete drying approx. 1mm per day</li><li>Shelf life 9 months from the date of manufacture</li><li>Packaging 5 kg</li></ul><u>Properties:</u><ul><li>For interior use</li><li>Especially high quality gypsum with special additives</li><li>High crack resistance</li><li>Perfectly suited for HRAK type joints (Q1)</li><li>Easy to apply, gains strength quickly</li><li>Low shrinkage when drying</li></ul><u>Instructions for Use:</u><p>The substrate must be smooth, firm, clean and dry. Gypsum boards must be firmly and correctly fixed to the frame. Cut and end-edge gypsum board joints are primed with Knauf Tiefengrund. Spackling is only possible if it is ensured that the boards will not be subject to significant deformation due to temperature and humidity fluctuations. Gypsum board joints in ceiling structures are recommended to be filled only with Knauf Uniflott spackle.</p><p>Sieve the material into clean cold water, slightly below the water level (max. 2.5 kg per 1.2L of water). Allow the material to swell for a couple of minutes and mix with a trowel to a creamy, firm consistency. When filling gypsum board joints, if necessary, reinforcing tape can be placed in the joints. The second coat can only be applied once the first coat has dried. Screw heads or other fixings must also be filled. Do not use material that has started to set. It is recommended to apply at least 2 layers of spackle to the joints depending on the required surface smoothness. After filling the joints, after approx. 50 min., excess material can be removed from the joint edges with a spatula. In the second stage, use a trowel or wider spatula to create a smooth transition to the board surface. After drying, sand the joint with a sanding machine or a hand sanding block. Working time with the prepared spackle – approximately 45 minutes. Room and substrate temperature must not be lower than +10 °C.</p>
9.79 € EUR
SKU: 11393
Brand: Knauf
EAN: 4003982200273

This product is available at Zum.lv - the largest online store in Latvia.

View product on site